Challenge: Over time, temporary HP pipework had been used for the annulus instrumentation lines creating numerous potential leak points and access restrictions around the wellbay
Approach: AFS specified coned and threaded fittings throughout to meet the well pressure requirements. New instrumentation was installed at the same time
Result: The new installation was less susceptible to stress-related failure with significantly less potential leak points in the assembly and better access in the immediate area